In this area will be reported a short descriptionof the pilot and an updated detail of the deployment and test activities.
Picture and technical data will be reported in order to provide a clear understanding of the Pilot Deploymnet and of the ongoing tests.
In particular, several experimental test have been performed in the ASSEM Pilot.
In this area will also be possibile to have a detailed (numerical) description of the tests.
For any request (e.g. to have the authorization and the PSW for the not public data) please refer to the Pilot coordinato: Dr. Massimo Fiori m.fiori@assemspa.it
Pilot Deployment: description of
Since beginning of 2019 ASSEM is performing the HW configuration of the field equipment (in particularly, switching devices of the Medium Voltage distribution grid and devices devoted to provide the frequency, voltage and Power signals to sensors).

In the second half of 2018 A.S.SE.M. S.p.A. has almost completed the SW configuration of the TLC equipment devoted to connect Secondary Substation to the SCADA system in place at the DSO control center. Router are based on a LTE technology (private APN is adopted). Then tests on the telecomunication architecture performance and reliability have been activated.

In the second half of 2018 A.S.SE.M. S.p.A. has almost completed the SW configuration of the field sensors dedicated to sample voltage, frequency and power over the Medium Voltage Grid.
In a second step it has been activated the data gathering at the SCADA in place at the DSO control center (so far just one single sensor is active, assessing the operation of the all chain between sensor and SCADA system).