{"id":52,"date":"2019-03-08T08:34:02","date_gmt":"2019-03-08T08:34:02","guid":{"rendered":"http:\/\/www.integridy.polimi.it\/?page_id=52"},"modified":"2019-03-12T12:43:35","modified_gmt":"2019-03-12T12:43:35","slug":"assem-pilot-project","status":"publish","type":"page","link":"http:\/\/www.integridy.polimi.it\/?page_id=52","title":{"rendered":"ASSEM Pilot Project"},"content":{"rendered":"\n<p>The goals of the pilot are related to the\nadvanced monitoring of the grid, the forecast of the power flows and, consequently,\nthe day ahead topology optimisation of the grid. <\/p>\n\n\n\n<p>Actually, distribution networks are built\nas radial systems, but with the possibility of back-feeding during\ncontingencies. They have some advantages over meshed networks, such as lower\nshort-circuit currents and simpler switching and protecting equipment. On the\nother hand, the radial structure provides less overall reliability. Nowadays,\nDSOs have the opportunity to change the topology of their grids in order to\nobtain an optimal configuration, in terms of losses or other operational\nindicators (Quality of Service, Hosting Capacity, etc.). <\/p>\n\n\n\n<p>To this purpose, it is pivotal to perform an accurate estimation of the state of network and on a predictive base in order to support DSOs in operating networks with great penetration of DG. To implement this predictive approach, the forecast of the power flows and advanced monitoring of the grid need to be developed. The information obtained from these mentioned partial goals can be used in advance to find the optimal grid topology. <\/p>\n\n\n\n<p>Generators will be consequently managed by\nthe electric protection and remote-control system of the DSO and exploited in\norder to optimise the grid reliability and efficiency. Moreover, an innovative\nplatform will be activated to evaluate the effectiveness of a coordinated\ncontrol of MV generators performed by the DSO in order to provide ancillary\nservices to the main grid.<\/p>\n\n\n\n<p>Moreover, new technologies are now getting\ninvolved in the picture, with one of the most promising being the energy\nstorage. In the pilot, a coordinated management of distributed energy storage\nwill be tested both in a final user perspective (improving the energy behaviour\nof LV users) and in the grid perspective (provide ancillary service to the\nlocal grid or to the national one).<\/p>\n\n\n\n<p>A.S.SE.M. SpA will coordinate all the\nactivities and will be in charge of the apparatuses deployment, the data\ngathering and the effective management of the test. Politecnico di Milano (POLIMI),\na technical university, will develop the innovative algorithms devoted to\noptimise the grid topology and the energy storage management in order to\nmonitor users\u2019 behaviour and provide forecast of the power injections. Moreover,\na SME, UNE s.r.l., will develop the innovative energy storage system.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"724\" src=\"http:\/\/www.integridy.polimi.it\/wp-content\/uploads\/2019\/03\/PilotaASSEM-1024x724.jpg\" alt=\"\" class=\"wp-image-53\" srcset=\"http:\/\/www.integridy.polimi.it\/wp-content\/uploads\/2019\/03\/PilotaASSEM-1024x724.jpg 1024w, http:\/\/www.integridy.polimi.it\/wp-content\/uploads\/2019\/03\/PilotaASSEM-300x212.jpg 300w, http:\/\/www.integridy.polimi.it\/wp-content\/uploads\/2019\/03\/PilotaASSEM-768x543.jpg 768w, http:\/\/www.integridy.polimi.it\/wp-content\/uploads\/2019\/03\/PilotaASSEM-1600x1131.jpg 1600w, http:\/\/www.integridy.polimi.it\/wp-content\/uploads\/2019\/03\/PilotaASSEM.jpg 1754w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The goals of the pilot are related to the advanced monitoring of the grid, the forecast of the power flows&hellip;<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-52","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/www.integridy.polimi.it\/index.php?rest_route=\/wp\/v2\/pages\/52","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.integridy.polimi.it\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/www.integridy.polimi.it\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/www.integridy.polimi.it\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/www.integridy.polimi.it\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=52"}],"version-history":[{"count":3,"href":"http:\/\/www.integridy.polimi.it\/index.php?rest_route=\/wp\/v2\/pages\/52\/revisions"}],"predecessor-version":[{"id":121,"href":"http:\/\/www.integridy.polimi.it\/index.php?rest_route=\/wp\/v2\/pages\/52\/revisions\/121"}],"wp:attachment":[{"href":"http:\/\/www.integridy.polimi.it\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=52"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}